Hi All,
Some of you may remember this thread before the server died.
I’m looking at removing gas from my patrol and put in the standard 95ltr back in the rear. I would like to keep my sub that is all ready under the drive side it’s about 50ltr, although keeping this at this stage is not high priority.
Looking for some info on how big this job is, I’ve heard if I’ve still got the fuel lines running to the back it shouldn’t be that hard.
Some of you may remember this thread before the server died.
I’m looking at removing gas from my patrol and put in the standard 95ltr back in the rear. I would like to keep my sub that is all ready under the drive side it’s about 50ltr, although keeping this at this stage is not high priority.
Looking for some info on how big this job is, I’ve heard if I’ve still got the fuel lines running to the back it shouldn’t be that hard.